Insulating an Ottawa Home? See the Code, the Rebates and the Price First

Get matched with local insulation contractors. See what new Ottawa houses get under the Building Code, which rebates are still open and when they close, and published prices, before anyone climbs into the attic.

Where in the house?

Free matching. No phone number needed; contractors reply by email. We do not inspect, license or screen the contractors we forward requests to, and we are not part of any rebate program.

An insulation installer in a respirator fitting pink batt insulation between wall studs, beside the Ottawa Insulation Contractors sign, with Parliament Hill behind

Where Does the Insulation Go?

Pick a part of the house to see what the Building Code gives new Ottawa houses, what a rebate may pay if you upgrade, and what a quote should cover.

Cross-section of an Ottawa house showing where insulation goes A two-storey house cut in half: (1) attic insulation over the top-floor ceiling with baffles at the eaves and vents at the top and bottom of the roof space (O. Reg. 163/24, 9.19.1.2 and 9.19.1.3; SB-12 R-60 for new houses); (2) above-grade walls with the vapour barrier on the warm side (9.25.4.3); (3) the rim joist above the foundation (SB-12 3.1.1.1.(14)); (4) basement walls insulated full height (9.25.2.3.(4)); (5) a crawl space under a one-storey addition; (6) a floor projecting over cold air (SB-12 R-31 exposed floor); (7) the continuous air barrier, shown as a dashed line (9.25.3.1). Values are minimums for new work, not a design. 1 2 3 4 5 6 7

insulation air barrier (dashed) venting and baffles

Code values shown are minimums for NEW houses and additions in Ottawa (Zone 1 of SB-12, package A1 for a gas furnace of 92% efficiency or more), not a design and not a requirement for an existing home.

1Attic

New Ottawa houses and additions get: R-60 in an attic (R-50 in packages A3 and A5) (SB-12 Table 3.1.1.2.A)

  • Attic vents at least 1/300 of the insulated ceiling area, at least a quarter at the top and a quarter at the bottom (9.19.1.2)
  • Where baffles are used, they keep at least a 25 mm air space and rise at least 50 mm above the insulation (9.19.1.3)
  • Loose-fill on a slope only up to 4.5 in 12 for mineral or cellulose fibre (9.25.2.4)

Rebate if you upgrade: Home Renovation Savings

  • Attic stream (no energy assessment): $800 to $1,250 maximum, by level (50% of the after-tax cost). Work must be finished by November 30, 2026.
  • Assessment path (energy assessment first): $900 to $1,500 maximum, by level. The follow-up assessment must be booked by November 30, 2026 and done by December 31, 2026 (or within 180 days of the first one, whichever comes first).

Funding may be fully allocated before the deadlines: the program's terms say no rebate is paid if program funding is fully allocated, modified, terminated or exhausted. Checked October 2026.

A quote should cover:

  • Material, finished depth and the R-value it gives
  • Baffles at the eaves and soffit vents kept clear
  • Attic hatch weatherstripped
  • How old insulation will be checked for vermiculite

2Above-grade walls

New Ottawa houses and additions get: R-22, or R-19 plus R-5 continuous (additions: R-19 + 5 ci) (SB-12 Tables 3.1.1.2.A and 3.1.1.11)

  • Vapour barrier on the warm side (9.25.4.3)
  • Air barrier continuous (9.25.3.1)
  • Loose-fill is permitted in the wood-frame walls of existing buildings (9.25.2.4.(3))

Rebate if you upgrade: Home Renovation Savings

  • Assessment path (energy assessment first): $1,200 to $3,600 maximum, by level. The follow-up assessment must be booked by November 30, 2026 and done by December 31, 2026 (or within 180 days of the first one, whichever comes first).

Funding may be fully allocated before the deadlines: the program's terms say no rebate is paid if program funding is fully allocated, modified, terminated or exhausted. Checked October 2026.

A quote should cover:

  • Method: blown, dense-packed, batts in open walls or exterior insulation
  • Wall area and target R-value
  • How the holes are closed and finished
  • Who asks the City about a permit if walls are opened

3Rim joist

New Ottawa houses and additions get: At least the above-grade wall value (SB-12 3.1.1.1.(14))

  • Foamed plastic in a wall or ceiling is covered from the room by an interior finish such as drywall, except where it faces concealed spaces (9.10.17.10)
  • Spray foam is applied to CAN/ULC-S705.2 (9.25.2.5.(1))

Rebate if you upgrade: Home Renovation Savings

  • Assessment path (energy assessment first): up to $300. The follow-up assessment must be booked by November 30, 2026 and done by December 31, 2026 (or within 180 days of the first one, whichever comes first).

Funding may be fully allocated before the deadlines: the program's terms say no rebate is paid if program funding is fully allocated, modified, terminated or exhausted. Checked October 2026.

A quote should cover:

  • Material and thickness at the rim
  • For spray foam: open-cell or closed-cell, and proof of the S705.2 standard
  • How the rim will be covered where the Code asks

4Basement walls

New Ottawa houses and additions get: R-20 continuous (or R-12 + R-10 continuous) (SB-12 Table 3.1.1.2.A, note 6)

  • Insulation over the full height of a foundation wall enclosing a basement (9.25.2.3.(4))
  • Air barrier continuous throughout the basement (9.25.3.1)

Rebate if you upgrade: Home Renovation Savings

  • Assessment path (energy assessment first): $900 to $1,500 maximum, by level. The follow-up assessment must be booked by November 30, 2026 and done by December 31, 2026 (or within 180 days of the first one, whichever comes first).

Funding may be fully allocated before the deadlines: the program's terms say no rebate is paid if program funding is fully allocated, modified, terminated or exhausted. Checked October 2026.

A quote should cover:

  • Material and continuous R-value
  • Air and vapour barrier details
  • Whether the rim joists are included
  • Any leak fixed first by a waterproofing contractor

5Crawl space

New Ottawa houses and additions get: A heated crawl space: insulated over the full height of its walls (9.25.2.3.(4))

  • Insulation in contact with the ground must be inert to soil and water (9.25.2.2.(3))
  • Hatches and sump pit covers in the air barrier are weatherstripped (9.25.3.3)

Rebate if you upgrade: Home Renovation Savings

  • Assessment path (energy assessment first): $600 to $1,200 maximum, by level. The follow-up assessment must be booked by November 30, 2026 and done by December 31, 2026 (or within 180 days of the first one, whichever comes first).

Funding may be fully allocated before the deadlines: the program's terms say no rebate is paid if program funding is fully allocated, modified, terminated or exhausted. Checked October 2026.

A quote should cover:

  • Walls, ceiling or both, and the R-value
  • Ground-contact material
  • How the crawl space is reached

6Floor over cold space

New Ottawa houses and additions get: R-31 for an exposed floor (SB-12 Table 3.1.1.2.A)

  • An exposed floor sits over unheated space or the outdoors, like a room over an unheated garage or an overhang
  • Vapour barrier on the warm side (9.25.4.3)

Rebate if you upgrade: Home Renovation Savings

  • Assessment path (energy assessment first): up to $300. The follow-up assessment must be booked by November 30, 2026 and done by December 31, 2026 (or within 180 days of the first one, whichever comes first).

Funding may be fully allocated before the deadlines: the program's terms say no rebate is paid if program funding is fully allocated, modified, terminated or exhausted. Checked October 2026.

A quote should cover:

  • The whole exposed area, in sq ft
  • Material and R-value
  • How the underside is closed

7Air leaks

New Ottawa houses and additions get: No R-value: a continuous air barrier (9.25.3)

  • Penetrations through the air barrier are sealed (9.25.3.3)
  • Sheet joints sealed, or lapped at least 100 mm and clamped (9.25.3.3.(2))
  • Gaps at chimneys and gas vents sealed with noncombustible material (9.25.3.3.(8))

Rebate if you upgrade: Home Renovation Savings

  • Assessment path (energy assessment first): $200 to $250 maximum, by level. The follow-up assessment must be booked by November 30, 2026 and done by December 31, 2026 (or within 180 days of the first one, whichever comes first).

Funding may be fully allocated before the deadlines: the program's terms say no rebate is paid if program funding is fully allocated, modified, terminated or exhausted. Checked October 2026.

A quote should cover:

  • What will be sealed and where
  • How the result is measured
  • How the house will be ventilated afterward (ask an HVAC contractor)

Rebate amounts are maximums, capped by how the home is heated, and funding may run out first: see the rebate details and conditions. Checked October 2026.

Existing homes: the Code's renovation rule is that work cannot leave the house worse than before (O. Reg. 163/24, 11.3.1.1). It does not force a top-up.

Insulation by part of the house: values for new Ottawa houses and additions (minimums, not a design)
PartNew houses and additionsSource
AtticR-60 in an attic (R-50 in packages A3 and A5)SB-12 Table 3.1.1.2.A
Above-grade wallsR-22, or R-19 plus R-5 continuous (additions: R-19 + 5 ci)SB-12 Tables 3.1.1.2.A and 3.1.1.11
Rim joistAt least the above-grade wall valueSB-12 3.1.1.1.(14)
Basement wallsR-20 continuous (or R-12 + R-10 continuous)SB-12 Table 3.1.1.2.A, note 6
Crawl spaceA heated crawl space: insulated over the full height of its walls9.25.2.3.(4)
Floor over cold spaceR-31 for an exposed floorSB-12 Table 3.1.1.2.A
Air leaksNo R-value: a continuous air barrier9.25.3

Rebates and Loans: What Is Open

Checked October 2026

Open until the deadlines

Home Renovation Savings

Enbridge Gas and Save on Energy

Attic stream (no energy assessment): 50% of the after-tax attic cost, maximum $800 to $1,250 depending on what is there now. Work must be finished by November 30, 2026.

Assessment path (energy assessment first): The follow-up assessment must be booked by November 30, 2026 and done by December 31, 2026 (or within 180 days of the first one, whichever comes first).

  • Atticup to $1,500
  • Exterior wallsup to $3,600
  • Basement wallsup to $1,500
  • Crawl space wallsup to $1,200
  • Exposed floorup to $300
  • Air sealingup to $250

Total rebates are capped by how the home is heated: up to $5,000 for a home heated with Enbridge-supplied natural gas, up to $10,000 for a home heated with electricity, oil, propane or wood on Ontario's electricity grid. A gas-heated home cannot collect every insulation maximum at once. Funding may be fully allocated before the deadlines: the program's terms say no rebate is paid if program funding is fully allocated, modified, terminated or exhausted.

We are not part of the program. It keeps its own list of participating contractors and says it does not endorse the contractors on it, so check the program's site directly.

Open

Better Homes Ottawa Loan

City of Ottawa

  • A loan repaid through your property tax bill, for insulation, air sealing, windows and doors
  • 20-year term, 4.33% fixed
  • From $10,000 up to $125,000 or 10% of the property's assessed value, whichever is less
  • 4% administrative fee; repay early without penalty
  • An EnerGuide home assessment is a required step

Closed

Closed or not open in Ontario

  • Canada Greener Homes Grant: closed (last day to submit documents was December 31, 2025)
  • Canada Greener Homes Loan: closed, no further applications approved
  • Enbridge Home Efficiency Rebate: ended intake January 27, 2025
  • Canada Greener Homes Affordability Program: Ontario is not among the provinces where residents can apply

Old Loose-Fill in the Attic? Test Before Anyone Touches It

“It is prudent, in the absence of evidence to the contrary, to assume that vermiculite insulation material produced before 1990 may contain some asbestos.”

Health Canada
  1. Leave it alone: Health Canada says don't disturb it or try to remove it yourself, and don't use the attic for storage.
  2. Have a professional test it for asbestos before any renovation.
  3. Testing and removal are abatement work, not insulation work.
Abatement in Ottawa: ottawaabatement.com

Frequently Asked Questions

Is there still a rebate for insulation in Ottawa?

Yes, for now. The Home Renovation Savings program (Enbridge Gas and Save on Energy) lists insulation rebates on two paths. The attic stream needs no energy assessment and pays 50% of the after-tax attic cost, up to a maximum of $800, $1,000 or $1,250 depending on how much insulation is there now, with work finished by November 30, 2026. The assessment path needs an energy assessment before any work and at least two upgrades, with the follow-up assessment booked by November 30, 2026 and done by December 31, 2026. A gas-heated home is capped at $5,000 in total. Funding may be fully allocated before those dates, and the federal Canada Greener Homes Grant and Loan are closed. We are not part of the program; check homerenovationsavings.ca (checked October 2026).

What R-values do new Ottawa houses get?

Ottawa is in Zone 1 of the Building Code's energy standard (SB-12) because its heating degree-days are under 5,000 (Ottawa City Hall: 4,440). For a new house heated by a gas furnace of at least 92% efficiency, package A1 lists R-60 in an attic, R-22 in above-grade walls, R-20 continuous on basement walls, R-31 for an exposed floor and R-10 under a heated or shallow slab. Other packages trade values, such as R-50 in the attic with other upgrades. These are values for new houses and additions, not a rule for an existing home.

Does adding insulation need a City building permit?

Insulation on its own is not named on either of the City's lists: not among the projects that need no permit, and not among the permit projects. Ask the City before walls or the roof are opened. Work that can come with insulation is on the permit list: adding or removing walls, enlarging or relocating a window or door, and structural repairs or alterations. Finishing a basement has its own City permit page, and designated heritage buildings are not subject to the exemptions.

Per square foot, what do attic, foam and removal jobs run?

Published 2025–2026 estimates from Ontario and Ottawa price pages put blown-in attic insulation at about $1.50 to $3.00 per square foot of attic (ask for the area on the quote), open-cell spray foam at about $1.00 to $2.75 per square foot, closed-cell at about $2.75 to $7, and removal of clean old insulation at about $0.75 to $2. Basement wall insulation runs about $2,000 to $8,000 for a typical job. These are published estimates, not rates; compare written quotes for the same area and R-value.

Get Matched Free

Tell us which part of the house you want insulated and we send it to local Ottawa insulation contractors

Fields marked are required. No phone number needed — your matches reply by email.

Find an Insulation Contractor